The problems that quietly consume availability, maintenance budget, and asset life—and the evidence-led ways to solve them.
An Egyptian fertilizer plant traced repeat steam-turbine trips to varnish in the governor valve. Its MPC result fell from 30.3 to 9.4 after in-service treatment.
The fresh oil may be clean, but the system is not. Learn why varnish survives the default fix, where the cost hides, and what a condition-led response looks like.